Shaft seal WBS

Shaft seal with metallic casing and dust lip (formerly DIN 3760 Form BS).

Application Range
Pressure: ≤ 0,5 bar
Temperature: -35 °C / +100 °C
Standard Material: NBR

Other materials are available for very high or very low operating temperatures. For detailled information, please look at the specific PDF catalogue or contact our application engineers.

Load product catalog

Are you missing materials or dimensions?

Feel free to contact us!

Our sealing experts will be happy to advise you!

+49(201)86606-0 or vk@techno-parts.de

Filter

Di [mm] Da [mm] b [mm]
Min:
Max:
Material selection
Material:
Availablility
Material No.
Loading data …
Profile Di [mm] Da [mm] b [mm] Material Mat. No. V Quantity